November

Img_3130-18

Preparing a new crossing point.

The purpose of this to allow access to lorries who will tip spoil in the gulley mentioned in the October update.

Members Geoff and Malcom led on this particular project over a couple of weeks.

Img_3129-18

The Drewry “Dougal” under continued renovation, receives further priming of the bodywork.

Img_3128-18

A young visitor to the site being cared for and briefed by Chris

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

October

Imgp0743-15

Progress is being made on the Track. The View from Oak Tree sidings is looking North East to East

In the distance is the burnt out (vandalised) Directors Coach and Oil Tank Wagon on track which has now been temporarily reconnected. The intention is to resite the coach allowing for further track renewal in this area.

Imgp0744-15

A view from the other way

Dscn0424-33

Supporters loading up the ‘Tug’ in preparation for another ‘go’.

Dscn0430-30

Even GP’s are not above doing something menial. Here levelling and packing is performed

Imgp0745-15

Points have been inserted at the start of the curve out of the RVR Station site in preparation for new sidings running parallel to the main line. Before that can go further forward, The Network Rail boundary is required to be moved and the gully between the two areas filled.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Dscn0205-15

The Supporters Association, official visit to Poland

Dscn0208-1502

Dscn0223-15

 

Dscn0225-15

 

 

_Polish Visit

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Se

Clearing more of the trackbed towards Northbridge Street,

Lifted wooden sleepers make way for more substantial concrete.

Imgp0728-15

No matter the time of year there is always track bed to be cleared. This area was cleared to ground level one year ago.

Imgp0730-15

“Sentinel” Awaiting relocation to another Heritage Railway.

Imgp0708-15

By the end of October even the track in the forground had been replaced by concrete sleepers.

Imgp0709-1502

ptember

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

July,

 

Imgp0619-15

On the Curve North Eastwards from the Station site early in July

The original running line is to the left. The new alignment purpose is to connect with the sidings for stock repositioning.

GR 5734,1238

Imgp0688-15

Later in the same month the connection to the siding is made and stock on the move (away from the camera).

The plan on the main running line is to smooth the curve and make provision for other layout needs in this area.

Img_3120-19

Different view of same activity.

Img_3125-20

Away from the Station site, the current extent of the line towards Bodiam.

A sad tale of vandalism in every respect.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Whilst track work was not always possible members have taken the opportunity to work on the stock.

One of our hardest working pieces of stock, the Smith Rodley, being primed for a new coat, whilst unable to work on the track.

Imgp0692-15

One of the Banana vans being refurbished. A lot of the insulation has been replace. Immediately following this shot the open left door was re-insulated, but does give a good idea of the robust door frame..

Imgp0690-15

The chassis of the BP Tank Wagon. Most of the ironwork has been primed but many of the timbers are required to be replaced.

The tank itself having already been primed.

Imgp0660-15

More body engine cover repairs to the Drewry Dougal, enthusiastically undertaken.

Imgp0654-15

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Imgp0673-15

From Bodiam Looking towards Robertsbridge

W-.S-W

578140,124955

Very well laid track and deep ballast.

With thanks to the Station Master at Bodiam that day

 

 

 

 

 

 

 

 

[Home] [Aspirations] [About Us] [Contact Us] [Financial Aid] [Events] [Stock List] [Updates] [2010 1st Half] [2009 2nd Half] [2009 1st Half] [2008 2nd Half] [2008 1st Half] [2007 2nd Half] [2007 1st Half] [2006 2nd Half] [2006 Winter] [2006 Spring] [2005 Autumn] [2005 Summer] [2005 Spring] [2005 Winter] [2004 2nd Half] [2004 1st Half] [Sales-n-Wants] [Members Area] [Links]